您好,欢迎来到尚佳旅游分享网。
搜索
您的当前位置:首页《工业自动化控制实训指导书》课程标准

《工业自动化控制实训指导书》课程标准

来源:尚佳旅游分享网



Followingparts of ordinary bolt connection: wall-beams, purlins, knee. Designof drainage, electrical, heating, ventilation, air conditioning,power should be subject to safety requirements for steel structuresof other professions, it is forbidden to weld hanging load andincreased roof and columns. Construction prepared and theconstruction layout first section material prepared and theprocessing production prepared according to Zhejiang more Palacesteel limited and Wuhan intelligent elevator limited by signed ofcontract file and the Institute provides of steel design blueprint, Icompany and the Organization Technology Department, productiondepartment, procurement Department, bid do Engineering Department,related production sector for drawings triage, and according toowners requirements timely design out production and the processingdetail and for has related professional sector of strictly triage,specific work process following: Bid do bid notice → TechnologyDepartment → add up do → procurement department → productiondepartment → quality Department → Engineering DepartmentTechnology Department production and the processing detail proposedHou, by add up do coordination the sector of supporting work, and byfigure line by varieties, and specifications, and quality forclassified, and notification Procurement Department for material ofmarket survey and procurement, by quality Department according to bypurchased material of specifications varieties for quality review andtest, not qualified of material varieties and specifications stronglyban for the engineering in the, After passing inspection informed theworkshop of production of timber according to strict productiondetails of production, workshop organized by the General Managerbefore the production technology and security sector technical safetytraining, safety education company to strictly three-leveldisclosure, training of qualified personnel is strictly prohibited topost production, production personnel must be listed to work, youmust have the corresponding certificate. Road workers must have thecertificate, and regular assessments should be carried out, not askilled operator posts is strictly prohibited. Production of variousitems of equipment, appliances and other, non-professional isstrictly prohibited actions and strict regulations, strong rewards,be eliminated. Production line set on person, title,responsibilities, and performance and safety comprehensiveassessment. Material procurement process strictly handling the

电子电器应用与维修重点建设专业

《工业自动化控制实训指导书》课程标准

撰稿人:陈世宇

来宾职业教育中心学校

修订日期:20146





Followingparts of ordinary bolt connection: wall-beams, purlins, knee. Designof drainage, electrical, heating, ventilation, air conditioning,power should be subject to safety requirements for steel structuresof other professions, it is forbidden to weld hanging load andincreased roof and columns. Construction prepared and theconstruction layout first section material prepared and theprocessing production prepared according to Zhejiang more Palacesteel limited and Wuhan intelligent elevator limited by signed ofcontract file and the Institute provides of steel design blueprint, Icompany and the Organization Technology Department, productiondepartment, procurement Department, bid do Engineering Department,related production sector for drawings triage, and according toowners requirements timely design out production and the processingdetail and for has related professional sector of strictly triage,specific work process following: Bid do bid notice → TechnologyDepartment

addup do → procurement department → production department →quality Department → Engineering Department Technology Departmentproduction and the processing detail proposed Hou, by add up docoordination the sector of supporting work, and by figure line byvarieties, and specifications, and quality for classified, andnotification Procurement Department for material of market survey andprocurement, by quality Department according to by purchased materialof specifications varieties for quality review and test, notqualified of material varieties and specifications strongly ban forthe engineering in the, After passing inspection informed theworkshop of production of timber according to strict productiondetails of production, workshop organized by the General Managerbefore the production technology and security sector technical safetytraining, safety education company to strictly three-leveldisclosure, training of qualified personnel is strictly prohibited topost

production,production personnel must be listed to work, you must have thecorresponding certificate. Road workers must have the certificate,and regular assessments should be carried out, not a skilled operatorposts is strictly prohibited. Production of various items ofequipment, appliances and other, non-professional is strictlyprohibited actions and strict regulations, strong rewards, beeliminated. Production line set on person, title, responsibilities,and performance and safety comprehensive assessment. Materialprocurement process strictly handling the

《工业自动化控制实训指导书》课程标准

一、课程性质与任务

本课程是中等职业学校电子技术类专业的一门专业核心教学与

训练项目课程。其任务是:使学生建立自动控制系统的基本概念,

握自动控制系统分析、校正的基本方法,初步掌握系统实验技能。为

了适应职业教育侧重现场技术应用的特点,本课程突出了与实际应用

方面相关的知识,减少了理论与计算方面的内容,为从事高新技术工作

打下坚实的基础。打破传统的以了解”“掌握为特征设定的学科型

课程目标,从任、 务与职业能力分析出发,设定职业能力培养目

标;变书本知识的传授为动手能力的培养,打破传统的以知识传授

为主的教学方式,变为以工作项目为主线,创设工作情景,结合


通过本课程的学习和项目训练,使学生提高实际操作和现场调试

方面的能力,本课程抛弃了自控理论中的数学抽象,尽量地给出自控

系统的定性概念及常用典型系统的经验结论。要求在理解有关自动控

制系统的基本概念,建立控制系统数学模型的基础上,掌握并灵活运

用时域法频率法进行系统分析及正确的性能分析。掌握系统分析、校

正的思路和方法,为日后控制系统的分析设计打下基础。实验重点放

在实际的恒值系统的控制实现上。系统的调试过程中体现实际问题的

解决能力。具有清晰的系统概念,具有控制方法的软件实现能力,系

统各个环节硬件的设计能力,总体调试能力是我们改革的宗旨。


1



Followingparts of ordinary bolt connection: wall-beams, purlins, knee. Designof drainage, electrical, heating, ventilation, air conditioning,power should be subject to safety requirements for steel structuresof other professions, it is forbidden to weld hanging load andincreased roof and columns. Construction prepared and theconstruction layout first section material prepared and theprocessing production prepared according to Zhejiang more Palacesteel limited and Wuhan intelligent elevator limited by signed ofcontract file and the Institute provides of steel design blueprint, Icompany and the Organization Technology Department, productiondepartment, procurement Department, bid do Engineering Department,related production sector for drawings triage, and according toowners requirements timely design out production and the processingdetail and for has related professional sector of strictly triage,specific work process following: Bid do bid notice → TechnologyDepartment

addup do → procurement department → production department →quality Department → Engineering Department Technology Departmentproduction and the processing detail proposed Hou, by add up docoordination the sector of supporting work, and by figure line byvarieties, and specifications, and quality for classified, andnotification Procurement Department for material of market survey andprocurement, by quality Department according to by purchased materialof specifications varieties for quality review and test, notqualified of material varieties and specifications strongly ban forthe engineering in the, After passing inspection informed theworkshop of production of timber according to strict productiondetails of production, workshop organized by the General Managerbefore the production technology and security sector technical safetytraining, safety education company to strictly three-leveldisclosure, training of qualified personnel is strictly prohibited topost

production,production personnel must be listed to work, you must have thecorresponding certificate. Road workers must have the certificate,and regular assessments should be carried out, not a skilled operatorposts is strictly prohibited. Production of various items ofequipment, appliances and other, non-professional is strictlyprohibited actions and strict regulations, strong rewards, beeliminated. Production line set on person, title, responsibilities,and performance and safety comprehensive assessment. Materialprocurement process strictly handling the

三、教学内容结构
模块一 可编程控制器(PLC
模块二 变频器
模块三 触摸屏
模块四 自动化生产控制系统
模块五 液压与气动自动化
模块六控制系统综合实训
每个项目分相关知识
典型自动化控制学习项目共六大实训项目,和技能训练两部分,将相关知识和实践过程有机结合,力求体现“做
中学”、“学中做”的教学理念;紧紧围绕完成项目任务的需要来选择课
程内容与教学设计 ;课程教学内容源于企业岗位典型工作任务。但经过科学提炼 ;课程教学目标源于企业岗位知识技能要求。突出能力培
及其工艺流程引入教学。学习情境是企业工作环境的缩影与再现。课
程采用项目式教学及多种教学方法并用,素质教育引入专业课教学,
明确学生的学习目的,激发学生的学习兴趣,挖掘学生的学习潜能,
保证课程教学任务的完成与教学目标的达到。

教学总时数约为100学时。

四、教学内容与要求

教学
项目

教学内容

教学基本要求

一、编程控制器(PLC

1S7-300400硬件模块

机架
接口模块功能模块

电源模块

信号模块 通信模块

占位模块仿真器模块


2



Followingparts of ordinary bolt connection: wall-beams, purlins, knee. Designof drainage, electrical, heating, ventilation, air conditioning,power should be subject to safety requirements for steel structuresof other professions, it is forbidden to weld hanging load andincreased roof and columns. Construction prepared and theconstruction layout first section material prepared and theprocessing production prepared according to Zhejiang more Palacesteel limited and Wuhan intelligent elevator limited by signed ofcontract file and the Institute provides of steel design blueprint, Icompany and the Organization Technology Department, productiondepartment, procurement Department, bid do Engineering Department,related production sector for drawings triage, and according toowners requirements timely design out production and the processingdetail and for has related professional sector of strictly triage,specific work process following: Bid do bid notice → TechnologyDepartment → add up do → procurement department → productiondepartment → quality Department → Engineering DepartmentTechnology Department production and the processing detail proposedHou, by add up do coordination the sector of supporting work, and byfigure line by varieties, and specifications, and quality forclassified, and notification Procurement Department for material ofmarket survey and procurement, by quality Department according to bypurchased material of specifications varieties for quality review andtest, not qualified of material varieties and specifications stronglyban for the engineering in the, After passing inspection informed theworkshop of production of timber according to strict productiondetails of production, workshop organized by the General Managerbefore the production technology and security sector technical safetytraining, safety education company to strictly three-leveldisclosure, training of qualified personnel is strictly prohibited topost production, production personnel must be listed to work, youmust have the corresponding certificate. Road workers must have thecertificate, and regular assessments should be carried out, not askilled operator posts is strictly prohibited. Production of variousitems of equipment, appliances and other, non-professional isstrictly prohibited actions and strict regulations, strong rewards,be eliminated. Production line set on person, title,responsibilities, and performance and safety comprehensiveassessment. Material procurement process strictly handling the


硬件安装

s7.3 00 系列模块的安装规范 S7-400 系列模块的安装规范

更换模块

更换S7.3 00 SM 模块
更换S7-400 SM 模块

硬件组态

组态硬件模块
保存、下载和上传组态参数


自动生产线硬件设计

配置模块参数
更新硬件目录

二 变频器

1、掌握变频器的外部正确接线;;

1、变频器的外端子电路连接;

2、正确设置变频器的相关参数

2、相关参数的设置调试;

3、能够进行变频变频器的外部操作

3、描述实验过程和读取相关数据

三、自动

化生产

w控制系

物料灌装自动生产线

确定系统控制任务与设计

自动化控制系统设计流程

要求制定电气控制方案

确定系统控制任务与设计要求

确定控制系统的输入/输出信号豆网

ww.t 控制程序设计

aodocs.co控制程序设计

现场运行调试

四、液压与气动自动化






























五、触摸






3



Followingparts of ordinary bolt connection: wall-beams, purlins, knee. Designof drainage, electrical, heating, ventilation, air conditioning,power should be subject to safety requirements for steel structuresof other professions, it is forbidden to weld hanging load andincreased roof and columns. Construction prepared and theconstruction layout first section material prepared and theprocessing production prepared according to Zhejiang more Palacesteel limited and Wuhan intelligent elevator limited by signed ofcontract file and the Institute provides of steel design blueprint, Icompany and the Organization Technology Department, productiondepartment, procurement Department, bid do Engineering Department,related production sector for drawings triage, and according toowners requirements timely design out production and the processingdetail and for has related professional sector of strictly triage,specific work process following: Bid do bid notice → TechnologyDepartment → add up do → procurement department → productiondepartment → quality Department → Engineering DepartmentTechnology Department production and the processing detail proposedHou, by add up do coordination the sector of supporting work, and byfigure line by varieties, and specifications, and quality forclassified, and notification Procurement Department for material ofmarket survey and procurement, by quality Department according to bypurchased material of specifications varieties for quality review andtest, not qualified of material varieties and specifications stronglyban for the engineering in the, After passing inspection informed theworkshop of production of timber according to strict productiondetails of production, workshop organized by the General Managerbefore the production technology and security sector technical safetytraining, safety education company to strictly three-leveldisclosure, training of qualified personnel is strictly prohibited topost production, production personnel must be listed to work, youmust have the corresponding certificate. Road workers must have thecertificate, and regular assessments should be carried out, not askilled operator posts is strictly prohibited. Production of variousitems of equipment, appliances and other, non-professional isstrictly prohibited actions and strict regulations, strong rewards,be eliminated. Production line set on person, title,responsibilities, and performance and safety comprehensiveassessment. Material procurement process strictly handling the







































六 控制系统w综合实










w



w.t

aodocs.co
























4



Followingparts of ordinary bolt connection: wall-beams, purlins, knee. Designof drainage, electrical, heating, ventilation, air conditioning,power should be subject to safety requirements for steel structuresof other professions, it is forbidden to weld hanging load andincreased roof and columns. Construction prepared and theconstruction layout first section material prepared and theprocessing production prepared according to Zhejiang more Palacesteel limited and Wuhan intelligent elevator limited by signed ofcontract file and the Institute provides of steel design blueprint, Icompany and the Organization Technology Department, productiondepartment, procurement Department, bid do Engineering Department,related production sector for drawings triage, and according toowners requirements timely design out production and the processingdetail and for has related professional sector of strictly triage,specific work process following: Bid do bid notice → TechnologyDepartment → add up do → procurement department → productiondepartment → quality Department → Engineering DepartmentTechnology Department production and the processing detail proposedHou, by add up do coordination the sector of supporting work, and byfigure line by varieties, and specifications, and quality forclassified, and notification Procurement Department for material ofmarket survey and procurement, by quality Department according to bypurchased material of specifications varieties for quality review andtest, not qualified of material varieties and specifications stronglyban for the engineering in the, After passing inspection informed theworkshop of production of timber according to strict productiondetails of production, workshop organized by the General Managerbefore the production technology and security sector technical safetytraining, safety education company to strictly three-leveldisclosure, training of qualified personnel is strictly prohibited topost production, production personnel must be listed to work, youmust have the corresponding certificate. Road workers must have thecertificate, and regular assessments should be carried out, not askilled operator posts is strictly prohibited. Production of variousitems of equipment, appliances and other, non-professional isstrictly prohibited actions and strict regulations, strong rewards,be eliminated. Production line set on person, title,responsibilities, and performance and safety comprehensiveassessment. Material procurement process strictly handling the

五、教学实施

(一)学时安排建议

教学项目

教学内容

课时安排

一、编程控制器(PLC


















二 变频器












三、自动化生产控制系统








淘豆


自动化w四、

与气动

ww.taodocs.c

o

五、触摸




o

























六 控制系统综合实训

























(二)教学方法建议
1.以学生发展为本,重视培养学生的综合素质和职业能力,以适

5



Followingparts of ordinary bolt connection: wall-beams, purlins, knee. Designof drainage, electrical, heating, ventilation, air conditioning,power should be subject to safety requirements for steel structuresof other professions, it is forbidden to weld hanging load andincreased roof and columns. Construction prepared and theconstruction layout first section material prepared and theprocessing production prepared according to Zhejiang more Palacesteel limited and Wuhan intelligent elevator limited by signed ofcontract file and the Institute provides of steel design blueprint, Icompany and the Organization Technology Department, productiondepartment, procurement Department, bid do Engineering Department,related production sector for drawings triage, and according toowners requirements timely design out production and the processingdetail and for has related professional sector of strictly triage,specific work process following: Bid do bid notice → TechnologyDepartment

addup do → procurement department → production department →quality Department → Engineering Department Technology Departmentproduction and the processing detail proposed Hou, by add up docoordination the sector of supporting work, and by figure line byvarieties, and specifications, and quality for classified, andnotification Procurement Department for material of market survey andprocurement, by quality Department according to by purchased materialof specifications varieties for quality review and test, notqualified of material varieties and specifications strongly ban forthe engineering in the, After passing inspection informed theworkshop of production of timber according to strict productiondetails of production, workshop organized by the General Managerbefore the production technology and security sector technical safetytraining, safety education company to strictly three-leveldisclosure, training of qualified personnel is strictly prohibited topost

production,production personnel must be listed to work, you must have thecorresponding certificate. Road workers must have the certificate,and regular assessments should be carried out, not a skilled operatorposts is strictly prohibited. Production of various items ofequipment, appliances and other, non-professional is strictlyprohibited actions and strict regulations, strong rewards, beeliminated. Production line set on person, title, responsibilities,and performance and safety comprehensive assessment. Materialprocurement process strictly handling the

现代工业自动化带来的职业岗位变化,为学生的可持续发展奠定基础。

教学过程中,应融入对学生职业道德和职业意识的培养。

2.坚持“做中学、做中教”,积极探索理论和实践相结合的教学模

式,应立足于加强学生实际操作能力的培养,采用项目教学,以工作

任务引领提高学生学习兴趣,激发学生的成就动机。

(四)教学条件

该课程是在自动化控制技术实训室完成的,本实训室是一个一流

的职业教育教学、实训基地。它由计算机及网络同步教学系统、视频,

音频和投影仪等多媒体教学系统以及自动化控制技术实训系统,即工

业自动化生产加工系统模型等组成。教学系统和投影仪、音频、视频

学环境。
等多媒体教学系统组成。为自动化控制技术教学提供了一个良好的教


标准的基本理念、课程目标、基本内容和要求,并整体反映在教材之

中。

(一)教学组织

本课程采用项目教学法。课程教学内容分为6个具有实际功能的

项目模块。模块由浅入深,循序渐进。由老师给出各项目模块的功

能任务,提出完成项目的基本知识、技能要求和要提交的项目资料;

学生56个人为一学习小组,选择一个项目,由组长组织大家根据

功能给出设计方案;经老师确认后制定出项目实施计划、对组员进行

项目分工,组织实施共同完成项目,在此期间老师及时帮助解决各小

组在项目制作过程中出现的各类问题;最后由老师组织学生对各组项

6



Followingparts of ordinary bolt connection: wall-beams, purlins, knee. Designof drainage, electrical, heating, ventilation, air conditioning,power should be subject to safety requirements for steel structuresof other professions, it is forbidden to weld hanging load andincreased roof and columns. Construction prepared and theconstruction layout first section material prepared and theprocessing production prepared according to Zhejiang more Palacesteel limited and Wuhan intelligent elevator limited by signed ofcontract file and the Institute provides of steel design blueprint, Icompany and the Organization Technology Department, productiondepartment, procurement Department, bid do Engineering Department,related production sector for drawings triage, and according toowners requirements timely design out production and the processingdetail and for has related professional sector of strictly triage,specific work process following: Bid do bid notice → TechnologyDepartment

addup do → procurement department → production department →quality Department → Engineering Department Technology Departmentproduction and the processing detail proposed Hou, by add up docoordination the sector of supporting work, and by figure line byvarieties, and specifications, and quality for classified, andnotification Procurement Department for material of market survey andprocurement, by quality Department according to by purchased materialof specifications varieties for quality review and test, notqualified of material varieties and specifications strongly ban forthe engineering in the, After passing inspection informed theworkshop of production of timber according to strict productiondetails of production, workshop organized by the General Managerbefore the production technology and security sector technical safetytraining, safety education company to strictly three-leveldisclosure, training of qualified personnel is strictly prohibited topost

production,production personnel must be listed to work, you must have thecorresponding certificate. Road workers must have the certificate,and regular assessments should be carried out, not a skilled operatorposts is strictly prohibited. Production of various items ofequipment, appliances and other, non-professional is strictlyprohibited actions and strict regulations, strong rewards, beeliminated. Production line set on person, title, responsibilities,and performance and safety comprehensive assessment. Materialprocurement process strictly handling the

目进行功能演示、答辩,进行测评,完成知识技能的再归纳
(二)教学方法
在教学方式上,我们主要以体现培养学生职业能力,尤其是方法能力与社会人性化能力的“项目教学法”来完成课程教学,教学过程充分调动学生的学习积极性,主动性。他们是主体,老师给与辅导。这 而且培养了他们的团队合作能力、交样不仅培养了学生的知识技能,流沟通的社会能力。学生们在实际项目完成的过程中达到本课程的教学目的。

(三)实践教学
本课程教学已经实现课堂与实践一体化教学模式。学生在实践
过程中学习知识,训练技能,掌握技术。在“做中学,学中练,练中
用,用中强”。最终达到课程教学目标。
常规作业设计和实际技能测试相结合的考评制度,
促进学生创新能力的发展。

2.考核与评价要根据本课程的特点,改革单一考核方式,不仅关注学生对知识的理解、技能的掌握和能力的提高,还要重视规范操作、安全文明生产等职业素质的形成,以及节约能源、节省原材料与爱护工具设备、保护环境等意识与观念的树立。



7

Copyright © 2019- shangjiatang.cn 版权所有 湘ICP备2022005869号-4

违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com

本站由北京市万商天勤律师事务所王兴未律师提供法律服务